Box 3

 Container

Contains 29 Results:

Span #10 floor beam erection, Somerset/Fall River Bridge, no. 48, 1963-06-24

 Item — Box: 3
Identifier: PC2. 153
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-06-24

Span #10 floor beam erecting, Somerset/Fall River Bridge, no. 49, 1963-06-24

 Item — Box: 3
Identifier: PC2. 154
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-06-24

Superstructure looking east, Somerset/Fall River Bridge, no. 50, 1963-07-06

 Item — Box: 3
Identifier: PC2. 155
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-06

Girder erecting span 12, Somerset/Fall River Bridge, no. 51, 1963-07-10

 Item — Box: 3
Identifier: PC2. 156
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-10

Southerly girder erection span 12, Somerset/Fall River Bridge, no. 52, 1963-07-10

 Item — Box: 3
Identifier: PC2. 157
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-10

Southerly girder erection span 12, Somerset/Fall River Bridge, no. 53, 1963-07-10

 Item — Box: 3
Identifier: PC2. 158
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-10

Girder erection span 14, Somerset/Fall River Bridge, no. 54, 1963-07-25

 Item — Box: 3
Identifier: PC2. 159
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-25

Girder erection span 14, Somerset/Fall River Bridge, no. 55, 1963-07-25

 Item — Box: 3
Identifier: PC2. 160
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-25

Girder erection span 14, Somerset/Fall River Bridge, no. 56, 1963-07-25

 Item — Box: 3
Identifier: PC2. 161
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-07-25

North girder span 15, Somerset/Fall River Bridge, no. 57, 1963-08-06

 Item — Box: 3
Identifier: PC2. 162
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1963-08-06