SENG Building repairs and upgrades (Epsilon Associates), 2021-2022
Dates
- 2021-2022
Extent
1 Linear Feet (1 flat box) : Color photographic prints, before and after, 4 CD with copies of photographs, letter from Epsilon Associates, and copy of the MOU ; 8.75 x 12 in.
Language of Materials
From the Collection: English
Immediate Source of Acquisition
Photographic documentation of the building repairs and upgrades performed on the Science and Engineering building between 2021-2022. Supplied by Epsilon Associates, Inc., 3 Mill & Main PLace, Suite 250, Maynard, Mass. per MOU signed July 2021 by UMass Dartmouth, the University of Massachusetts Building Authority and the Massachusetts Historical Commission. Received by the Archives September 2022. Accession # 23-03.
Repository Details
Part of the Claire T. Carney Library Archives and Special Collections, University of Massachusetts Dartmouth Repository