Erecting 157 ton girder east abutment to Pier 25, Somerset/Fall River Bridge, no. 8, 1962-11-01

 Item — Box: 2
Identifier: PC2. 112
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-01

Sliding girder into position, Somerset/Fall River Bridge, no. 9, 1962-11-02

 Item — Box: 2
Identifier: PC2. 113
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-02

East abutment rolling northerly girder into section, Somerset/Fall River Bridge, no. 10, 1962-11-02

 Item — Box: 2
Identifier: PC2. 114
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-02

Lifting southerly girder span 26, Somerset/Fall River Bridge, no. 11, 1962-11-06

 Item — Box: 2
Identifier: PC2. 115
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-06

Landing span 26 southerly girder on east abutment, Somerset/Fall River Bridge, no. 12, 1962-11-06

 Item — Box: 2
Identifier: PC2. 116
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-06

Southerly girder span 26 erected, Somerset/Fall River Bridge, no. 13, 1962-11-06

 Item — Box: 2
Identifier: PC2. 117
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-11-06

S-1 Traveler on span 26, Somerset/Fall River Bridge, no. 14, 1962-12-04

 Item — Box: 2
Identifier: PC2. 118
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-12-04

Erecting southerly girders span 25, Somerset/Fall River Bridge, no. 15, 1962-12-04

 Item — Box: 2
Identifier: PC2. 119
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-12-04

Southerly girder connection span 25, Somerset/Fall River Bridge, no. 16, 1962-12-04

 Item — Box: 2
Identifier: PC2. 120
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-12-04

Southerly girder connection span 25, Somerset/Fall River Bridge, no. 17, 1962-12-04

 Item — Box: 2
Identifier: PC2. 121
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1962-12-04