At Station 185-50 looking East, Somerset/Fall River [Taunton River] Bridge, no. 5 , 1960-12-20

 Item — Box: 1
Identifier: PC2.11
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1960-12-20

Bearing pile set up at Globe Wharf, Somerset/Fall River [Taunton River] Bridge, no. 6 , 1960-12-20

 Item — Box: 1
Identifier: PC2.12
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1960-12-20

Driving steel sheeting for cofferdam at Pier No. 8, Somerset/Fall River [Taunton River] Bridge, no. 7 , 1961-03-16

 Item — Box: 1
Identifier: PC2.13
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-03-16

laying temporary water line in vicinity of Pier 10, Somerset/Fall River [Taunton River] Bridge, no, 8 , 1961-03-16

 Item — Box: 1
Identifier: PC2.14
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-03-16

Cofferdam at Pier No. 16, looking South, Somerset/Fall River [Taunton River] Bridge, no. 9 , 1961-03-16

 Item — Box: 1
Identifier: PC2.15
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-03-16

Welding of pile splices at Globe Wharf, Somerset/Fall River [Taunton River] Bridge, no. 10 , 1961-03-16

 Item — Box: 1
Identifier: PC2.16
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-03-16

Pile loading test at Pier 16, Somerset/Fall River [Taunton River] Bridge, no. 11 , 1961-04-24

 Item — Box: 1
Identifier: PC2.17
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-04-24

Girders on test pile at Pier 16, Somerset/Fall River [Taunton River] Bridge, no, 12 , 1961-04-24

 Item — Box: 1
Identifier: PC2.18
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: Other: 1961-04-24

Cofferdam at Pier #16 after all piles were driven, Somerset/Fall River Bridge, no. 35, 1961-08-25

 Item — Box: 1
Identifier: PC2.41
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1961-08-25

Dravo's mixer boat in operation at Pier # 10, Somerset/Fall River Bridge, no. 36, 1961-08-25

 Item — Box: 1
Identifier: PC2. 42
Scope and Contents From the Collection: The collection consists of 175 photoprints detailing the progress of the construction of Interstate 195’s bridges and interchanges in the Fall River area, with the majority being construction of the bridge between Fall River and Somerset, Massachusetts, over the Taunton River. There are four contracts documented, each group originally housed in a separate binder. Each photograph is labelled and numbered by either the photographer or the contractor, the sequence of which is not always clear...
Dates: 1961-08-25